Welcome TO TACO Company For General Contracting.

Our vision and focus has been to deliver high value projects for our clients with the emphasis
on communication and attention to detail.

TACO Company has an Experts engineers and technicians in erecting, testing & commissioning GIS & AIS substation. This company aimed to do the job in proper way with high quality and in minimum time. They all finished their studies in Iraq. While some them got training in companies’ specialist in manufacturing GIS Substation Components.

About TACO

TACO Company has an Experts engineers and technicians in erecting, testing & commissioning GIS & AIS substation.

 

MISSION

Our Roadmap starts with our mission, which is enduring. It declares our purpose as a company and serves as the standard against which we weigh our actions and decisions.

VISION

Our vision and focus has been to deliver high value projects for our clients with the emphasis on communication and attention to detail.

What We Do

We Brings What you Expect.

  • Engineering
  • Electrical
  • TAC
  • CIAT
  • CEE

TACO as an EPC contractor has a specialized engineering teams in design and analysis of power
plant facilities. Substation and overhead transmission line. design modification packages, design testing and implementation, design review, and design quality assurance.

TACO has a group of creative and experienced engineers who can provide timely and
acknowledgeable professional services.

TACO engineers & technicians develop tremendous experiences with industrial projects designs in Power, Oil, and Gas sectors in Iraq, providing all design and analysis of industrial foundations, process, and non‐process buildings, HVAC & Fire‐Fighting.

TACO Engineering and Technical staff have the experiences and skills to perform all type of construction work to cover the Electrical Balance of Power Plants, in addition to the erection of GIS & AIS substations equipment’s up to the 400KV and repairing its components. Erection of high voltage towers, cables and re‐constructing the electrical network related to them up to 400 KV substations. Also, TACO is able to erect and repair all the appliances and the electrical engines.

Testing and Commissioning (TAC): TACO performing all tests and commissioning for power plant and substation TACO engineers participated in several training courses and got authorization and qualification certificates from international companies and institutes.

Control, Instrument and Telecommunication (CIAT): TACO has wide experience in the design, installation, and maintenance of PLC, RTU, DAS, DCS, SCADA, and PABX Systems. The excellent experience of TACO in installation and maintenance is being reinforced by design activities in these fields with a growing design team and joint‐ventures with experienced companies worldwide. Furthermore, Hard working to demonstrate the recognized role in developing Iraq’s’ Information and Communication Technology infrastructures.

Civil Engineering Experiences (CEE): TACO Civil Engineers have tremendous field and academic experiences to perform all Civil Engineering and Construction of Power Plants, such as machines foundations, industrial buildings, switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds, and administration and support buildings.

Our Services

We Provide Value to Our Clients.

.

Electrical Construction

POWER PLANTS, SUBSTATIONS (GIS AND AIS) & OVERHEAD TRANSMISSION LINE (OHTL): Installation whole the equipment in the power plants and substation (GIS and AIS) Such as power transformers, GIS Equipment 400KV, 132KV, 33KV & 11KV, AIS equipment such as (SA, DS, CB, CVT, CT, LT), GTG and accessories, Electrical motors, power cable with its accessories, control and protection panels, SCADA System & stringing of Overhead transmission line ( OHTL ). Read More…

.

Test and Commissioning

PRIMARY TEST Perform test and Commissioning in Power Plants, GIS and AIS systems as Power transformer tests, High voltage test for 400KV & 132KV GIS substation, CT, PT, CVT, CB, DS ES, SA tests, AC HI-POT test for SWGR and Busbars, DC HI_POT test for cables, Partial discharge test, Generator and Excitation system tests, FOC signal attenuation test by OTDR and SF6 test for GIS. Read More…

,

Operation & Maintenance

Maintenance and operation of substations (GIS&AIS), switchgears, MCC and Power Systems, Generators and power Transformers.

Contact Us

If you’ve got questions or ideas you would like to share, send a message. For anything more specific, Call Us Now

How to Contact Us?

If you’ve got questions or ideas you would like to share, send a message. For anything more specific, please use one of the addresses listed below.

Our Location

Al Mansoor / Al Amirat St. M.601 / St. 15 / House 49/1

Direct Line Numbers

+(964)770 243 0218
+(964)770 313 3888

Our Email

Info@taco-iq.com

Let's Talk...

After we get some information from you, we’ll set up a time to discuss your project in further detail.